Commissioning

Commissioning is only permitted if:

Commissioning the ventilation system

  1. Check the installation before switching on.
  2. Ensure that all ventilation units, room air controls and system components are correctly installed and connected in accordance with the wiring diagram in the appendix. All covers and protective devices must be in place.
  3. Switch the mains fuse on. The ventilation units start up in ventilation level 2 and heat recovery operating mode.
  4. Call up the service menu or commissioning software.
  5. If necessary, activate the connected components in the service menu of the master RLS 45 K: Ventilation units, power units, sensors, EnOcean wireless module or additional components at the 230 V input, etc.
  6. Activate the components connected to the slave RLS 45 K.
  7. With an even number of units on the master RLS 45 K , call up the Automatic search (Plug & Play) parameter. The function ensures automatic pairing of the ventilation units. The units no longer need to be activated and addressed manually.
  8. If there is an odd number of devices , use the commissioning software to enter the device addresses of the individual ventilation units and determine ventilation unit pairs.
  9. After completing the parameterisation, carry out a function test:
    • Test operation and operating modes.
    • Test ventilation levels and off-function.
    • For the radio-controlled units, test the EnOcean functions.
    • Test the LEDs on the room air controls.