Infopool: Further instructions

These instructions contain important information on installation preparation and installation during the shell construction phase.
See separate instructions for installing the external cover.

Observe the attached safety instruction sheet.

Installation instructions for external cover PP 45 AK/AE/AW/AS

Guidelines for mounting the external cover.

Quick start guide for CPP 60

Brief description of the control elements (ventilation levels, operating modes), symbols and LEDs of the room air control. Information on changing the filter.

Installation/commissioning instructions for CPP 60

Information on installing the room air control system, sensors, power units, commissioning the ventilation system, information on commissioning software and troubleshooting.

Commissioning software (Windows)

Commissioning software for CPP 60 ventilation units with RLS 45 K controllers. Can also be used for mixed systems with RV 2, PP 45 or PPB 30 ventilation units.

 

Information on the commissioning software: