PTC thermistor triggering system, on/off switch

  1. Install PTC thermistor triggering system and wire in accordance with wiring diagram (wiring diagram, Fig. E, terminals 4, 5 and 6). Recommendation: It is imperative that MAICO MVS 6 be installed outside the area with a potentially explosive atmosphere.
  2. Fit an On/Off switch provided by the customer.