Installation instructions
- Permissible maximum temperature of air medium +40 °C.
- Make sure you use mounting material which is sized for the purpose.
- Do not tension or crush fan when installing. Make sure that the surface is flat. Malfunctions in the event of rubbing impeller.
- Make a core drill hole. Minimum core hole Ø = 150 mm. Recommendation: Use wall sleeve WH 150, drill minimum core hole Ø of 170 mm. Provide a suitable slope of 1 to 2 % to the exterior wall.
- Lead a sufficient length of the power cable out of the wall.
- Installation preparations for ceiling or duct installation such as wall installation.
- For wall/duct installation, observe installation position "TOP".
- When installing the duct, deburr the edges on the inside of the duct.
- Thermally insulate ventilation ducts properly. Allow for a condensation drain or condensate collector in riser.
DANGER due to short circuit/fire if condensation forms in the housing.
Ensure sufficient supply air intake.