Approval provisions

Approval provision

ER-UPD EC + ER EC / ER EC 2.1/second room connection

ER-UPB EC + ER EC / ER EC 2.1

Number of units per floor, residential unit or fire zone

Max. 3 fans or 3 connections

Max. 3 fans or 3 connections

Shaft wall

min. 35 mm , board material, any

min. 35 mm , board material, any

Connection diameter

DN 75 or DN 80 mm

Connection ducts inside the shaft

Steel folded spiral-seams duct between main duct in shaft and ER unit, max. 2 m long (→ approval)

Flexible aluminium duct AFR 80 or steel folded spiral-seams duct between main duct in shaft and ER unit, max. 2 m long (→ approval).

.

Connection ducts outside the shaft

Steel folded spiral-seams duct DN 75 or DN 80 between main duct in shaft and ER unit, max. 2 m long (→ approval).

Duct elbows in the unit connection duct

Max. 90° bend,
ascending

 

Number of duct elbows permitted for wall installation

Max. 2 x 90°

Number of duct elbows permitted for ceiling installation

Max. 2 x 90°

Regulating equipment in the exhaust air duct

Not permitted

Wall/ceiling opening for DN 80 unit connection duct

Brickwork or concrete: 130 mm.

Board materials (F90): Outer Ø of pipe