Installation information for ER-UPB EC housing
(also Requirements in line with approval and approval)
ER-UPB EC are equipped with fire protection cover and metal shut-off damper with release mechanism.
Wall installation is described below. Ceiling installation should be undertaken following the description for wall installation.
Housings can be installed with a discharge direction (discharge connection) upwards, to the right or left. With an upwards discharge direction, the yoke spring should be removed from the shut-off device.
Suitable mounting material is to be provided by the customer. To screw down the connection duct use steel screws, if screwing into brickwork/concrete use steel dowels.
The metal shut-off device should be prepared according to these instructions.