ER-UPB single-room installation

5

Metal discharge connection with shut-off damper

18

Main duct, steel folded spiral-seams duct

19

Connection duct, flexible aluminium duct AFR DN75/80

20

Power cable

37

UPM 60/100 mounting support

38

Plaster protective cover

39

Cable grommet

  1. Remove the plaster protective cover from the housing.
  2. NOTICE The unit will be damaged and function impaired if the fixing screws used are incorrect/too long.

    Fixing screws may not penetrate into the housing.

    1. Use the screws provided (UPM 60/100 mounting support).
  3. Install the housing with the discharge direction (outgoing air wall connection) facing upwards, right or left.
  4. Mark the fixing holes for the mounting support on rear wall of the shaft/shaft wall, drill dowel holes and insert the steel dowels.
  5. DANGER Danger of short-circuits and damage to the unit.

    If the cable grommet is not installed correctly, water may penetrate the housing. The degree of protection can no longer be guaranteed.

    1. Drive through cable grommet so that it can seal the cable sheathing all the way round (circular, no slots).
  6. Guide power cable from rear of housing through cable grommet into housing.
  7. Place the housing in the desired position and fasten it to the rear wall of the shaft/shaft wall with both mounting supports.
  8. DANGER Fire may spread if connection duct is incorrectly installed.

    1. Only use permitted duct material (Requirements in line with approval).
    2. Correctly attach connection duct to exhaust socket.
  9. Tightly connect the connection duct to the outgoing air wall connections, e.g. with cold-shrink tape.
  10. Make electrical connection.
  11. Insert the plaster protective cover in the housing.
  12. Plaster in housing flush with front edge, note tile thickness if necessary: Important information about plastering.