Power supply for the ventilation unit
The power supply must be connected to terminal 2. On-site fuses and RCDs must be installed in accordance with the electrical specifications of the RLT air handling unit [11].
Terminal designation: | R | S | T | N | PE |
Cable core: | L1 | L2 | L3 | N | PE |
All internal cables (main switch, fans, control components, sensors, ...) are pre-wired.
Only the 400 V connection to terminal 2 is required for the power supply