Power supply for the ventilation unit

The power supply must be connected to terminal 2. On-site fuses and RCDs must be installed in accordance with the electrical specifications of the RLT air handling unit [11].

Terminal designation:

R

S

T

N

PE

Cable core:

L1

L2

L3

N

PE

All internal cables (main switch, fans, control components, sensors, ...) are pre-wired.

Only the 400 V connection to terminal 2 is required for the power supply