Fitting the RV 2 AL external covers
RV 2 AL soffit variants = Accessories for RV 2 VLR (right) and RV 2 VLL (left) pre-installation kits

Figure RV 2 VLR. Not shown RV 2 VLL.
1 | RV 2 pre-installation kit 90° (soffit) |
2 | External grille – soffit |
3 | Fixing screw (2 pcs.) |
Observe safety instructions!
CAUTION Risk of injury when handling housing parts with sharp components, e.g. stainless steel external covers. Wear protective gloves.
- Once the external plastering is complete, remove the plaster protective cover. The 90° deflection unit of the RV 2 mounting sleeve must be plastered flush.
- Clean the condensate drain of the RV 2 mounting sleeve. The condensate must be able to drain freely.
- Insert the external grille into the 90° deflection unit and screw tight with the two fixing screws provided. ATTENTION: Ensure condensate drainage. Condensate must not penetrate between the mounting sleeve and the exterior wall.
- Check and ensure that the external grille is firmly seated.
- Recommendation: Additionally seal the external grille.