Infopool: Further instructions
These instructions contain important information for the specialist installer on installing and commissioning the RV 2 ventilation units and on the various setting options. The specialist installer receives information on installing the room air control system, sensors, power units, commissioning the ventilation system, information on the commissioning software and troubleshooting. The connection options on the bus system and on the 230 V input of the RLS 45 K control unit are also shown. Observe the supplementary safety instructions for PushPull ventilation units with important information for operators and specialist installers. |
Commissioning software (Windows)
Commissioning software for RV 2 ventilation units with RLS 45 K controllers. Can also be used for mixed systems with PP 45 or PPB 30 ventilation units.
|
|
Operating instructions for RV 2
Information on operation with the room air control, functional descriptions and information on the ventilation system settings.

Installation instructions for RV 2 pre-installation kit
Information on installation preparations and installation of the mounting sleeve during the shell construction phase.

Installation instructions for RV 2 VS + RV 2 VS 90E renovation pre-installation kit
Information on installation preparations and installation of the serial renovation pre-installation kit during the shell construction phase (mounting sleeve, 90° deflection unit, external covers).

Installation instructions for RV 2 final installation kit
Information on final installation with installation and electrical connection of the slide-in module and installation of the internal cover.



