Preparing parapet installation

  1. Wall up the parapet.
  2. Lay empty ducts/cabling to the installation location of the mounting sleeve. For information on cabling, see chapter Cable laying, empty ducts, flush-mounted boxes.
  3. Measure the wall thickness (take into account the insulation of the masonry, plaster thickness inside and plaster thickness outside).
  4. Unpack the pre-installation kit on site.