Soffit installation
- Proceed as described in chapter Vertical, straight soffit installation RV 2 VV.
- Observe the following installation illustrations.

Exterior wall

Exterior wall

Exterior wall

Exterior wall
- Ensure that the plaster frames are correctly positioned, aligned and sealed with the plaster protection on the inside and outside. The frames must not protrude from the finished plaster (max. flush, rather protruding inwards). Ensure that the plaster protection is firmly fitted.
- Plaster the soffit.
Die 90° mounting sleeve may be mounted as flush as possible with the outside of the masonry!