Infopool: Further instructions
The RV 2 VS pre-installation kit for renovation work has been specially developed for the renovation of old buildings with thermal insulation. These instructions contain important information for the specialist installer on installing the pre-installation kit for renovation work (mounting sleeve), 90° deflection unit for renovation work and the stainless steel external cover. The pre-installation kit is supplied in the two packaging units RV 2 VS and RV 2 VS 90E. The RV 2 final installation with the installation of the slide-in module and the internal cover is described in the installation instructions RV 2 final installation kit. It is imperative to observe the supplementary safety instructions for PushPull ventilation units with important information for users and specialist installers. |
Installation instructions for RV 2 final installation kit
Information on final installation with installation and electrical connection of the slide-in module and installation of the internal cover.

Quick start guide for RV 2
Brief description of the control elements (ventilation levels, operating modes), symbols and LEDs of the room air control. Information on changing the filter.

Operating instructions for RV 2
Information on operation with the room air control, functional descriptions and information on the ventilation system settings.

Installation/commissioning instructions for RV 2
CDV commissioning software
Information on installing the room air control system, sensors, power units, commissioning the ventilation system, information on commissioning software and troubleshooting.

Information on the CDV commissioning software:
