Scope of delivery
Packaging unit 1: RV 2 VS
- Mounting sleeve of the pre-installation kit for renovation work, length 500 mm, with red plaster primer, can be shortened to 365 mm
- Internal plaster frame (supplied loose), 4 screws fixed to mounting sleeve
- Internal plaster protective cover, inserted in the internal plaster frame
- These installation instructions in the packaging unit Pre-installation kit for renovation work
- Supplementary safety instructions for PushPull ventilation units
Packaging unit 2: RV 2 VS 90E
- 90° deflection unit for renovation work, length 450 mm, can be shortened to 220 mm, incl. adapter, permanently bonded
- Mounting brackets, 4 pieces
- Adhesive tape, 1 m
- Stainless steel external cover complete, with stainless steel support and drip edge + 4 screws, stainless steel external grille + 2 screws