Applying façade/plaster

ATTENTION: During the shell construction phase, protect the installation unit from contamination.

  1. Mask the opening of the 90° deflection unit for renovation work on the outside wall with suitable adhesive tape.
  2. On the inside of the wall, protect the mounting sleeve of the pre-installation kit for renovation work with the enclosed plaster protective cover.
  3. Professionally install façade insulation on the exterior wall and plaster the façade. Comply with valid building regulations.