Infopool: Further instructions

These instructions contain important information for the specialist installer on final installation of the slide-in module and the internal cover. For mounting the RV 2 external cover, see separate instructions.
Final installation takes place after installation of the RV 2 mounting sleeve and completion of the plastering and painting work. Please observe the PushPull safety instructions supplementary sheet with important information for users and specialist installers.

 

Installation instructions for RV 2 pre-installation kit

Information on installation preparations and installation of the mounting sleeve during the shell construction phase.

 

Installation instructions for RV 2 external cover

Information on installation of the RV 2 external cover on the exterior wall.

 

Quick start guide for RV 2

Brief description of the control elements (ventilation levels, operating modes), symbols and LEDs of the room air control. Information on changing the filter.

 

Operating instructions for RV 2

Information on operation with the room air control, functional descriptions and information on the ventilation system settings.

 

Installation/commissioning instructions for RV 2
CDV commissioning software

Information on installing the room air control system, sensors, power units, commissioning the ventilation system, information on commissioning software and troubleshooting.

Information on the CDV commissioning software: