PP/RV 2/CPP 60 quick start guide: Settings, filter change
Quick start guide for RLS 45 K, RLS 45 O room air controls and DS 45 RC radio switch + information on changing filters.
Chapter 2: Controls for operating and setting the PP 45 O, PP 45 K, PP 45 RC, PPB 30 O, PPB 30 K, PPB 30 RC, RV 2 and CPP 60 ventilation units. Chapter 3 with information on changing the filter on the PP 45, PPB 30, RV 2 and CPP 60.
ATTENTION: For correct commissioning of these ventilation units, be sure to read the corresponding installation and commissioning instructions. Follow the instructions.