Possible combinations

ER-A

ER-AH/-AH NFC

ER-AK/-AK NFC

ER-AB/-AB NFC

ER EC 2.1

ER GH AP

ER GH APB

The electrical cable and ventilation connection are to be laid in the shell construction phase.

Final installation is undertaken once the plastering and paint work is complete: Place the fan insert into the housing and attach the cover with air filter. For covers ER-AK/-AK NFC, ER-AH/-AH NFC, ER-AB/-AB NFC, adjust the setting values as necessary.

Surface-mounted housing

  • ER GH AP: Model without fire protection. With maintenance-free plastic backflow preventer.
  • ER-APB: Fire protection model with maintenance-free fire protection shut-off device K 90-18017 (metal backflow preventer with soldered strut).

Fan insert

Covers