Installation instructions
- Observe the installation instructions in chapter Installation of the parapet wall for RV 2 VH. Installation only permitted by qualified personnel in accordance with chapter Specialist installer qualifications.
- Observe the vertical installation position. Align the mounting sleeve precisely with a spirit level.
- Place the mounting sleeve in the soffit. Remove the overlying brick. Adjust masonry if necessary.
- Take the alignment to the window into account.
- Take the load transfer into account, see planning documents and chapter Note the following when selecting the installation location.
- To transfer the load to the mounting sleeve, lay the bricks above in a half offset.
- Installation in combination with roller shutters is very tight. Make sure the mounting sleeve is exactly flush on the outside.
- If the mounting sleeve is not positioned perfectly on the outside, but too far in, there may be problems with the roller shutter guide rail.
- If there is a gap between the roller shutter guide rail and the mounting sleeve, fill it with acrylic. Use pre-compressed sealing strip to ensure driving rain tightness in accordance with the current state of the art and the recognised rules of technology.